打印

PROFINET 认证规范表

[复制链接]
560|0
手机看帖
扫描二维码
随时随地手机跟帖
跳转到指定楼层
楼主
wxwangyan12|  楼主 | 2019-11-6 17:44 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
3.1 Purpose and Scope
The purpose of this document is to define the acceptance test plan for the PROFINET
functionality embedded in the /91 Universal Communications Gateway module
This document focuses on the PROFINET portion of the ATP for the /91 Universal
Gateway and assumes that the BSP and EGD application code have passed the EGD
System Test Plan
The acceptance test can be broken into three distinct areas with each area focused on a
specific goal.
 EGD Integration Tests
 PLC Interoperability Tests
 PROFINET Certification Tests
3.2 Overview
Acceptance tasks take place throughout the project life cycle and culminate in
acceptance testing.
Acceptance Testing incorporates four phases:
1. Defining the acceptance criteria
2. Developing an acceptance test plan
3. Executing the acceptance test plan
4. Reaching acceptance based on the test results
3.3 Acceptance Criteria Definition
3.3.1 Overview
This section defines the acceptance criteria and provides a high-level checklist to
enter and exit test execution.
3.3.1.1 Entrance Criteria
The entrance criteria detailed below must be completed prior to starting formal
acceptance testing:



PROFINET Acceptance Test Plan.pdf

1.9 MB

使用特权

评论回复

相关帖子

发新帖 我要提问
您需要登录后才可以回帖 登录 | 注册

本版积分规则

1

主题

1

帖子

0

粉丝